UMA Du Bois Library 7th Floor Renovations.
Complete renovation of the West section of the 7th Floor for a new office suite.
UMA Du Bois Library Fire Protection System.
Complete installation of a new Fire Protection system for the 28 story library on the UMASS Amherst Campus. The work includes the addition of a fire pump and alarm modifications for the sprinkler system, construction of Fire Pump and Electrical Rooms and construction of new Fire Protection systems distribution. The work was done in coordination with two other concurrent projects within the building.
Upgrade of HVAC and Electric Service for Goodell Hall on the UMASS Amherst Campus.
Renovations were made to a historically significant building in the Town of Sturbridge.
Forish Construction constructed at Westover a new hangar and office space for the Massachusetts State Police Air Wing.
Forish Construction was there for the Town of Plainfield when they were ready to build a public safety building for housing their fire apparatus and ambulances. Their new building also includes offfices, meeting rooms, locker rooms and shower facilities.
Forish Construction built for the City of Westfield a new 6000 sq. ft. facility when they needed the space. The building has space for the server/network, dispatch, storage, and other areas needed by emergency management.
Forish Construction built for the Town of Warren a new Highway Garage and a Sand/Salt storage shed.
Construction of a new 4,000 square foot steel storage facility for the Town of Buckland.